CASE STUDY: VILLA MORETTI
News about Gas Absorption products, about ROBUR Corporation and about HVAC market
09.13.2005
Case Study: Villa Moretti
Air conditioning systems with ROBUR Gas Absorption chillers
The air-conditioning system has been built with 4 pipes (heating and cooling on two different primary circuits) to guarantee the people comfort and the particular climate for the exhibited masterpieces (paintings. prints. etc.).
The basement is heated by a radiant panels system giving the absence of people and the low summer load; the air-conditioning system has been set up on all over the extension with a fan-coil spread system.
The complete case study is attached to this news.