Case Study: Villa Moretti

choose your language
For 60Hz electrical requirements please visit US website

CASE STUDY: VILLA MORETTI

News about Gas Absorption products, about ROBUR Corporation and about HVAC market

09.13.2005
Case Study: Villa Moretti

Air conditioning systems with ROBUR Gas Absorption chillers

The air-conditioning system has been built with 4 pipes (heating and cooling on two different primary circuits) to guarantee the people comfort and the particular climate for the exhibited masterpieces (paintings. prints. etc.).

The basement is heated by a radiant panels system giving the absence of people and the low summer load; the air-conditioning system has been set up on all over the extension with a fan-coil spread system.

The complete case study is attached to this news.

ASK FOR FURTHER INFORMATION